Installation and Maintenance of Quarry Crushing Machine

Go down

Installation and Maintenance of Quarry Crushing Machine Empty Installation and Maintenance of Quarry Crushing Machine

Post by W13579 Thu Mar 12, 2015 7:30 am

Quarry crusher machine maintenance is an extremely important regular work, it should work closely with the operation and maintenance extremely so full staff on duty should be checked.
Maintenance of quarry crusher:
Bearing shoulder the entire load of quarry crusher machine, so good lubrication of the bearing life of a great relationship, it directly affects the life and the operation rate of quarry crusher machine, which requires the injection of oil must be clean, seal must be good, quarry crusher the main oiling at:
(1) rotary bearing (2) roller bearing (3) all of the gears (4) mobile bearing, a sliding plane.
The newly installed tire prone to loosening must always be checked. Note that the various parts of quarry crusher is working properly. Pay attention to check the degree of wear parts wear, and pay attention to the replacement of worn parts. Put the active device chassis plane should avoid activities out dust and other materials bearing on the chassis can not move quarry crusher could not have broken material, so as to cause a serious accident. Bearing temperature rise, the reasons should be eliminated immediately stopped and checked. Turn the gear in operation should be immediately stopped if the impact of the sound check and eliminate.
Installation of quarry crusher : 1. the device should be installed on a level concrete foundation with anchor bolts. 2. the installation should pay attention to the main body vertical and horizontal. 3. After installation check all parts for loose bolts and host doors are secure and, if requested to tighten. 4. according to the configuration of power equipment and power line control switch. 5, the inspection is completed, empty load test, test the normal production.

W13579

Posts : 18
Points : 3477
Reputation : 0
Join date : 2014-12-04

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum